Views
2 years ago

2021 May June Marina World

  • Text
  • Pontoons
  • Premier
  • Hoist
  • Boating
  • Waterfront
  • Bellingham
  • Projects
  • Boats
  • Marine
  • Marinas
The magazine for the marina industry

SMART P O RT S O LUTIO

SMART P O RT S O LUTIO NS A L L - I N - O NE S M A RT S OLU T I ONS REQUEST FOR A QUOTATION ? EXISTING ERP COMPATIBLE INS T A LLED 50 M A R I N A S IN WWW.NAUTICSPOT.COM CONTACT@NAUTICSPOT.FR +33 4 67 13 00 44 MARINA APP DOCK SENSOR SMART MOORING BUOY SAFE MARINA i n P o r t o f C a n n es This innovative solution reassures local residents and boaters, and helps to reduce incidents on the port area. Steals and irruptions have significantly reduced since Nauticspot SafeMarina solution has been deployed. Eric BARRAT -General Manager - Port of Cannes. In the Cannes marina, the pontoons are open to the public and the boats are exposed to the risk of theft and damage. Thanks to its main partner, Milestone, Nautispot deployed a smart solution using synchronized cameras and artificial intelligence software to improve security and safety. This technology is able to detect suspicious behaviour and any accidents to visitors. F U NCT I O N A L F E ATU R ES & AI SOFTW ARE VIRTUAL PERIMETERS & BORDER CROSSING SET UP NO MASK WEARING DETECTION BEHAVIOUR ANALYSIS PASSER-BY AND VEHICLE COUNTING EARLY WARNINGS AND CAMERAS DISPLAY IN PC SECURITY

WORLD NEWS Leisure boat haven in archipelago SWEDEN: With over 24,000 islands to explore, the Stockholm Archipelago is a boating paradise. But until the Värmdö Municipality opened the first phase of its new marina at Stavsnäs Vinterhamn (Winter Harbour) there was no recreational guest facility in the area. Currently offering slips for 70 boats, the marina is protected by a 70m (230ft) breakwater installed by SF Marina using its SFBW 400 floating wave attenuating pontoons. These are built of double-reinforced concrete, are virtually unsinkable and have a proven track record in brutal storms the world over. Each section is connected using an energy-absorbing coupling system that distributes stress during heavy wave action. SF 1030 concrete pontoons were selected for the 120m (390ft) long walkway, along with WM-Bommen fingers of 6 to 10m (20 to 33ft) to suit a wide range of boats. The main walkway has integrated ducts that feed the El-Björn power pedestals, and slips also feature freshwater hook-ups and free WiFi. The breakwater and walkway were built on the other side of Sweden at SF Marina’s Wallhamn facility and transported to the site by barge. Because of their modular design, installation was faster than for traditional timber or poured concrete structures. Stavsnäs Vinterhamn is an important public and freight transportation hub between the Swedish mainland and archipelago islands. The new recreational marina features a pump-out, harbour office, store, repair centre, shower facilities and increased parking area. Residential housing is planned. Phase two of the marina project will begin in spring 2022. Dates confirmed for Superyacht Summit UAE: P&O Marinas and Fabulous Yachts will host the next International Superyacht Summit from 8 th -9 th December 2021 aboard the iconic QE2 liner in Dubai. The event will unite key players from the superyacht industry, including superyacht marina developers, superyacht builders and others. Discussions will shed light on the impact of superyacht marina developments in terms of lifestyle and tourism, and examine emerging trends in the GCC and the world over. Hamza Mustafa, chief operating officer of P&O Marinas, commented: “The International Superyacht Summit is a much-awaited event not only for enthusiasts in the UAE but those from around the globe. We are thrilled to announce our 2021 edition that will reinforce Dubai’s position as a leading superyacht destination. By joining forces with Fabulous Yachts, who have been our partners for the past two summits, we hope to build on our achievements and continue our mission to promote the region as a superyacht and luxury tourist destination.” www.marinaworld.com – May/June 2021 11 SUCCESSFUL WATERFRONT THE #1 DEVELOPMENT MARINA STARTS BUILDER. WITH LASTING INFRASTRUCTURE. EXPERT EXPERT DOCK DOCK BUILDER BUILDER AND AND MARINE MARINE CONTRACTOR CONTRACTOR bellingham-marine.com 800-733-5679

Back Issues